Buying industrial equipment from a supplier?

Dilenza provides independent vendor inspection services during manufacturing, fabrication, assembly and testing—helping project teams verify requirements before equipment leaves the supplier.

From one critical witness point to recurring manufacturing surveillance or final FAT, we match inspectors according to the equipment, technical scope, required qualifications, supplier location and project schedule.

Inspection can follow your:

  • ITP
  • Purchase Order
  • Technical Specification
  • Drawings
  • Approved Procedures
  • Project Standards

ITP · PO · Specification · Drawings accepted

Manufacturing journey

  1. Materials

    Review

  2. Fabrication

    Witness

  3. Assembly

    Hold

  4. Testing

    Monitor

  5. Release

    Verify

  • Single Visit
  • Recurring
  • Resident
  • Multi-Site
Why vendor inspection?

Find Problems While They Can Still Be Corrected

Industrial equipment can pass through many manufacturing stages before reaching the project site.

Once fabrication is complete, internal areas may become inaccessible.

Once equipment is painted, assembled, packed or shipped, correcting a problem becomes more difficult.

Vendor inspection provides independent technical visibility while manufacturing is still taking place.

It can help your team verify:

  • Project-defined inspection points
  • Materials and traceability
  • Manufacturing progress
  • Fabrication quality
  • Welding activities
  • Dimensions
  • Mechanical assembly
  • NDT status
  • Testing
  • Documentation
  • Coating status
  • Packing and preservation
  • Outstanding non-conformities

Inspect at the supplier. Resolve issues before they become site problems.

How it works

Inspection Follows the Manufacturing Process

  1. 01

    Documentation

    • ITP
    • Drawings
    • Specifications
    • Procedures
  2. 02

    Materials

    • Certificates
    • Identification
    • Traceability
  3. 03

    Manufacturing

    • Fabrication
    • Welding
    • Machining
    • Assembly
  4. 04

    Inspection Points

    • Hold
    • Witness
    • Review
    • Surveillance
  5. 05

    Testing

    • NDT
    • Pressure Tests
    • Functional Tests
    • FAT
  6. 06

    Final Verification

    • Documentation
    • Marking
    • Preservation
    • Packing
    • Release Status

The exact sequence depends on the equipment and approved project documentation.

ITP-driven inspection

Hold Points, Witness Points and Manufacturing Milestones

Vendor inspection should not be a generic factory visit.

For many industrial projects, the Inspection and Test Plan (ITP) defines where independent inspection is required throughout manufacturing.

Depending on the approved ITP, Dilenza inspectors can attend:

  • Hold Points

    Defined stages where work should not proceed until the required inspection or authorization has taken place according to the project arrangements.

  • Witness Points

    Activities where the nominated party is given the opportunity to attend and witness a defined manufacturing or testing activity.

  • Review Points

    Project-defined documentation or records reviewed as part of the inspection scope.

  • Surveillance

    Independent attendance during manufacturing to observe specified production or quality activities.

The inspector follows the controlled project requirements and assigned responsibilities, rather than creating acceptance criteria at the supplier.

Inspection scope

What Can a Vendor Inspector Check?

The scope depends on what is being manufactured. Typical vendor inspection activities can include:

  • Documentation

    • Approved drawings
    • Inspection and Test Plan
    • Manufacturing procedures
    • Material certificates
    • Welding documentation
    • NDT records
    • Calibration records
    • Test procedures
    • Previous inspection findings
    • Manufacturing data book status
  • Materials & Traceability

    • Material identification
    • Material certificates
    • Heat or batch identification
    • Traceability
    • Project-required markings
    • PMI status where specified
  • Manufacturing & Fabrication

    • Manufacturing progress
    • Workmanship
    • Fabrication condition
    • Fit-up
    • Welding status
    • Dimensions
    • Machining
    • Mechanical assembly
    • Interfaces between components

    Where specialist welding inspection is required, an appropriately qualified welding inspector can be selected.

  • NDT

    • VT
    • PT
    • MT
    • UT
    • RT
    • Other Specified Methods

    Where defined by the project. The vendor inspector may witness activities or verify NDT status according to the assigned responsibilities. NDT execution should be carried out by appropriately qualified personnel where required.

  • Testing

    • Pressure Testing
    • Hydrostatic Testing
    • Functional Testing
    • Performance Testing
    • Load Testing
    • Electrical or Mechanical Tests

    The exact test and acceptance criteria must come from the applicable project documentation.

  • Coating & Surface Protection

    • Surface Condition
    • Coating Status
    • DFT Records
    • Preservation
    • Repair Status

    Projects requiring specialist coating inspection can be matched with qualified AMPP, FROSIO or other specified coating inspectors.

  • Final Verification

    • Visual condition
    • Equipment completeness
    • Nameplates and markings
    • Outstanding punch items
    • Documentation status
    • Preservation
    • Packing
    • Shipping marks
    • Project-defined release status

    Before shipment or project-defined release.

Inspect at the supplier. Resolve issues before they become site problems.

FAT witnessing

Factory Acceptance Test Inspection

For many engineered equipment packages, the Factory Acceptance Test (FAT) is one of the final opportunities to verify equipment before shipment.

Dilenza can provide vendor inspectors for FAT attendance according to the approved test procedure and project requirements.

Depending on the equipment, FAT witnessing may involve:

  • Functional Tests
  • Performance Tests
  • Pressure Tests
  • Mechanical Operation
  • Instrumentation Checks
  • Safety Functions
  • Project-Specific Testing

The inspector can document:

  • Activities Witnessed
  • Test Results
  • Deviations
  • Open Points
  • Photographic Evidence
  • Final Status

The inspector witnesses against the agreed test procedure—not an assumed checklist.

Equipment

Industrial Equipment We Inspect at Suppliers

Vendor inspection is most effective when the inspector understands the actual equipment.

  • Pressure Equipment & Piping

    • Pressure Vessels
    • Heat Exchangers
    • Columns
    • Boilers
    • Tanks
    • Piping
    • Valves
    • Skids

    Inspection can support materials, fabrication, welding, NDT, dimensional verification, pressure testing and documentation.

  • Industrial Machinery

    • Pumps
    • Compressors
    • Turbines
    • Mechanical Equipment
    • Production Machinery
    • Engineered Assemblies

    Inspection can support manufacturing, assembly, dimensional verification, functional testing and FAT.

  • Structural Steel & Heavy Fabrication

    • Frames
    • Modules
    • Platforms
    • Pipe Racks
    • Support Structures
    • Heavy Welded Assemblies

    Inspection can support material traceability, fit-up, welding, NDT, dimensions and final fabrication status.

  • Shipbuilding & Marine Equipment

    • Vessel Structures
    • Marine Equipment
    • Piping
    • Machinery
    • Offshore Modules

    Inspector selection can consider relevant shipbuilding, marine fabrication, welding or coating experience.

  • Energy Equipment

    • Power Equipment
    • Mechanical Packages
    • Fabricated Systems
    • Renewable-Energy Components

    Inspection can cover one manufacturing milestone or follow equipment through several production stages.

  • Oil, Gas & Process Equipment

    • Piping
    • Pressure Systems
    • Tanks
    • Skids
    • Mechanical Packages
    • Fabricated Equipment

    Inspection can be aligned with project-defined manufacturing and testing requirements.

The right inspector

Equipment First. Inspector Second.

A vendor inspector is not a generic profile.

An inspector experienced with pressure vessels may not be the right choice for rotating machinery.

A mechanical inspector may not be qualified to perform the welding responsibilities defined by your ITP.

A coating specialist may be required for a complex protective coating program.

Dilenza therefore reviews the project before selecting the profile.

  1. 01

    You Send

    Location · Equipment · ITP · Scope · Standards · Dates

  2. 02

    We Define the Profile

    Discipline · Qualification · Equipment Experience · Industry Experience

  3. 03

    We Match

    Technical Fit · Location · Availability · Duration

  4. 04

    You Review

    Relevant inspector profiles can be submitted for technical assessment where appropriate.

  5. 05

    Inspection

    The confirmed inspector attends according to the agreed project scope.

Inspection intensity

One Supplier Visit or Full Manufacturing Visibility?

Choose the inspection model that best matches your manufacturing schedule, inspection frequency and required level of supplier oversight.

One Visit

One hold point, witness point, test or FAT.

Flexible coverage

Match Inspection Frequency to Project Risk

Not every equipment package needs continuous inspection.

  • Single Visit

    Suitable for: One Hold Point · Test · FAT · Repair Verification · Final Inspection

  • Recurring Vendor Inspection

    Suitable when important inspection activities occur across several manufacturing stages. A recurring inspector can maintain visibility over progress, previous findings, repairs, ITP status, testing and documentation.

  • Resident Vendor Inspection

    For major equipment packages or manufacturing programs requiring frequent or continuous technical presence.

  • Rotational Inspection

    Structured technical coverage for longer manufacturing programs.

  • Multi-Site Vendor Inspection

    One project may include pressure equipment from Italy, machinery from Germany, fabrication from China and marine equipment from South Korea. Dilenza can coordinate technical inspection across several manufacturing locations.

Client-specific inspection

Client-Specific Vendor Inspection Requirements

Some projects define inspector requirements through client-specific qualification, designation or approval frameworks. Dilenza reviews these requirements against the controlled project documents before proposing profiles.

  • Saudi Aramco QM Inspection

    Project-specific inspection support for supplier manufacturing, fabrication, testing and defined inspection activities where a Saudi Aramco QM requirement forms part of the assignment.

Reporting

Know What Happened at the Supplier

A useful vendor inspection report should make the technical status understandable to a project team that was not present at the factory.

  • Supplier and inspection location
  • Equipment inspected
  • Manufacturing progress
  • Activities witnessed
  • ITP reference
  • Documents reviewed
  • Measurements
  • Test results
  • Photographic evidence
  • Deviations
  • Non-conformities
  • Repairs
  • Outstanding points
  • Previous finding status
  • Inspector observations
  • Project-defined hold or release status

What was inspected? What was found? What remains open?

Standards

Inspection Against the Project Requirements

Industrial suppliers manufacture equipment for projects using many different technical standards.

  • ASME
  • AWS
  • API
  • ISO
  • EN
  • Client Specifications
  • EPC Specifications
  • Classification Requirements
  • Manufacturer Procedures

Dilenza does not assume which code applies.

  • Standard
  • Edition
  • Acceptance Criteria
  • Inspection Point
  • Inspector Responsibility

must come from the controlled project documentation.

Independent project inspection

Clear Scope. Clear Responsibility.

Dilenza's vendor inspection service represents the purchaser's agreed technical inspection requirement at the supplier.

The inspector works against the scope provided for the assignment.

Vendor inspection should not automatically be treated as a substitute for:

  • Statutory Inspection
  • Notified-Body Activity
  • Authorized Inspection
  • Mandatory Certification
  • Legally Required Conformity Assessment

Where an authorized or regulatory function is required, that requirement should be identified separately. This distinction helps keep the independent purchaser inspection scope clear.

Global coverage

Vendor Inspection Where Your Equipment Is Manufactured

Industrial projects increasingly depend on suppliers across several countries. Dilenza can review vendor inspection requirements throughout major manufacturing regions in:

The supplier determines the location. The equipment and inspection scope determine the profile.

Why Dilenza

Vendor Inspection Built Around the Equipment

  • Technical Profile Matching

    We select according to the actual equipment and assigned inspection responsibilities.

  • Qualification Review

    Where specific credentials are required, they form part of inspector selection.

  • Flexible Attendance

    Attendance can cover a single witness point or months of supplier surveillance.

  • Profile Review

    Relevant CVs and qualifications can be submitted before confirmation where appropriate.

  • Specialist Support

    Welding, coating and other specialist profiles can be introduced where the scope requires them.

  • Global Manufacturing Coverage

    Inspection can be coordinated across suppliers in multiple countries.

What to send

Request Vendor Inspection

You do not need a perfectly prepared enquiry. Start with what you already have.

  • 01

    Supplier

    Country · City · Factory

  • 02

    Equipment

    What is being manufactured?

  • 03

    Inspection Point

    Hold · Witness · FAT · Surveillance · Final Inspection · Not Sure

  • 04

    Technical Requirements

    Required inspector qualification or discipline, if specified.

  • 05

    Schedule

    Date · Duration · Frequency

  • 06

    Documents

    ITP · PO · Specification · Drawings · Test Procedure

Request a Vendor Inspector

Have only the supplier location and ITP? Start with those.

FAQ

Vendor Inspection FAQ

What is vendor inspection?

Vendor inspection is independent technical inspection carried out at a supplier or manufacturer's facility to verify project-defined requirements during manufacturing, fabrication, assembly or testing.

What is the difference between vendor inspection and a factory audit?

A factory audit normally assesses the supplier's systems, capabilities or processes. Vendor inspection focuses on specific equipment or manufacturing activities being performed for a project.

What is vendor surveillance?

Vendor surveillance is repeated or ongoing technical attendance during manufacturing rather than inspection at only one final stage.

Can Dilenza follow our ITP?

Yes. Inspection can be structured around the client's approved Inspection and Test Plan and assigned hold, witness, review or surveillance points.

Can Dilenza attend a hold point?

Yes, where attendance at the hold point forms part of the agreed inspection scope.

Can Dilenza witness FAT?

Yes. Vendor inspectors can attend defined Factory Acceptance Test activities according to the approved test procedure and project requirements.

Can the inspector check material certificates?

Where material-document review forms part of the agreed scope, relevant certificates, identification and traceability can be verified against the project requirements.

Can the inspector check welding?

Yes, but specialist welding responsibilities should be assigned to an appropriately qualified welding inspector where required by the project.

Can the inspector check protective coatings?

General coating status may form part of a vendor inspection. Where specialist protective coating inspection is required, Dilenza can match appropriately qualified coating inspectors.

Can Dilenza provide vendor inspectors for pressure equipment?

Yes. Inspector profiles can be matched to pressure vessels, heat exchangers, piping, tanks, valves, skids and other pressure or process equipment.

Can Dilenza inspect machinery?

Yes. Machinery and mechanical-equipment inspection can support manufacturing, assembly, dimensional verification, functional testing and FAT according to the scope.

Can an inspector attend for only one day?

Yes. Single visits can support a specific hold point, witness point, test, FAT or final inspection.

Can Dilenza provide recurring vendor surveillance?

Yes. Recurring visits can be arranged throughout manufacturing according to project milestones or an agreed frequency.

Can Dilenza provide a resident vendor inspector?

Yes. Resident inspection can provide frequent or continuous supplier presence for longer manufacturing programs.

Can Dilenza inspect several suppliers for one project?

Yes. Multi-site inspection can coordinate technical coverage across several suppliers and manufacturing countries.

Can we review the inspector's CV before deployment?

Where appropriate, relevant CVs, qualifications and equipment experience can be submitted for client technical review before confirmation.

Does the vendor inspector approve equipment for shipment?

Only where that authority is explicitly defined by the project. The inspector reports according to the assigned responsibilities and should not assume purchaser, statutory or certification authority.

Request vendor inspection

Equipment Being Manufactured at a Supplier?

Send us the requirement.

Where?
Supplier · City · Country
What?
Equipment or Package
Which Stage?
Manufacturing · Hold Point · Witness Point · Testing · FAT · Final Inspection
Which Requirements?
ITP · Specification · Standard · Required Qualification
When?
Date · Duration · Frequency
Upload
ITP · PO · Drawings · Specification · Test Procedure

Not sure which inspector profile is required? Send us the equipment and available project documentation. We can review the technical requirement before profiles are considered.

ITP · PO · Drawings · Specification · Test Procedure

Supplier and project information is reviewed confidentially and used only to assess your inspection requirement.

See What Is Happening Before the Equipment Leaves the Supplier.

Independent vendor inspection matched to the equipment, manufacturing stage and project requirements.